bench@coreanvil:~/bringuptwo-bench lab · Ghent

PX-12 Harrow rev B [up]

Bring-up log for entry #15, 16-channel acquisition, first power 2026-03-19.

boardPX-12 Harrow (16-channel acquisition)
revisionrev B
state[up]
first power2026-03-19
closed2026-04-02
ownerIlse Vantorre
outstandingADC reference drifts above 60 C

Journal

2026-03-19 first power

Minimum population, limited supply. Rails up and in band; loader ran on the first try, console clean at 115200. Strap pins matched the schematic pin for pin. Promising board.

2026-04-02 closed

Full peripheral walk passed and 24 h soak flat. Closed as up. One note parked for watching: the on-chip ADC reference looked a touch warm-sensitive but was inside tolerance at room temperature.

2026-05-30 correction appended

Field unit came back reading 1.5% high on the analogue inputs in a hot cabinet. Reproduced on the bench: the ADC reference drifts above 60 C, out of the datasheet's own graph. Root cause is the reference part, not the layout. Logged as the board's standing outstanding item; rev C should move to an external reference.