bench@coreanvil:~/bringuptwo-bench lab · Ghent

ND-200 Sable rev A2 [up]

Bring-up log for entry #18, module baseboard, first power 2026-08-14.

boardND-200 Sable (module baseboard)
revisionrev A2
state[up]
first power2026-08-14
closed2026-08-19
ownerPieter Maes
outstanding(none)

Journal

2026-08-14 first power

rev A2, the fixed spin after rev A's reset glitch. Cold resistance clean. Rails up in order; the reset now releases cleanly with no brown-out retrigger, which was the whole point of A2. Loader and console up together.

2026-08-19 closed

Peripheral walk clean, thermal pass to the claimed maximum, 24 h soak flat. Closed as up with no outstanding items and no bodges. The rev A reset problem is gone; A2 is the build target.