GL-80 Quarry rev D [up]

Bring-up log for entry #14, industrial I/O carrier, first power 2025-11-07.

boardGL-80 Quarry (industrial I/O carrier)
revisionrev D
state[up]
first power2025-11-07
closed2025-11-21
ownerPieter Maes
outstanding(none)

Journal

2025-11-07 first power

Cold resistance clean, every rail over 400 Ohm to ground. Brought up current-limited at 2x idle with the comms module unpopulated. All four rails came up in the designed order; the 3V3 lagged the 1V2 by 8 ms, inside spec. Clock present at the SoC pin, 24.000 MHz, clean.

2025-11-12 peripheral walk

Walked the peripherals one at a time. Ethernet PHY linked at 1G, no retrains. The SD slot needed a 10k pull the schematic had as DNP; added it as a bodge and noted it for rev E. Thermal pass to 70 C in the enclosure, sensor on the regulator, no fold-back.

2025-11-21 closed

24 h soak in the enclosure, unattended, logged current every minute: flat within 3%. No outstanding items. Closed up; rev D is the one to build against. One bodge carried: the SD pull-up.